The redevelopment of the former Hodge Boiler Works Co. site on the East Boston waterfront
CUBE 3 is well-known nationally as a design industry and innovation leader—providing thoughtful, individualized solutions for a wide range of architectural, interior design and planning challenges. Offices in Lawrence, Boston and Miami.
cube 3 studio, cube 3, architecture, interiors, interior design, planning, master planning, programming, architectural design, LEED, academic, college campus, corporate, workplace, fitness, sports, healthcare, hospitals, hospitality, hotel, residential, retail, Lawrence, Boston, Massachusetts, New Hampshire, Rhode island, Miami, Florida
18598
post-template-default,single,single-post,postid-18598,single-format-standard,bridge-core-3.3.1,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-theme-ver-30.8.1,qode-theme-bridge,qode_header_in_grid,wpb-js-composer js-comp-ver-7.9,vc_responsive
 

The redevelopment of the former Hodge Boiler Works Co. site on the East Boston waterfront

The redevelopment of the former Hodge Boiler Works Co. site on the East Boston waterfront

119 apartments sought on E. Boston waterfront

Read the full article: Boston Herald
April 15, 2017
By Donna Goodison

A development at 99 Sumner Street/Hodge Boiler Works Site, East Boston, MA has been presented to the Boston Planning and Development Agency. Rendering by Cube 3 Studio

A development at 99 Sumner Street/Hodge Boiler Works Site, East Boston, MA has been presented to the Boston Planning and Development Agency. Rendering by Cube 3 Studio

The long-stalled redevelopment of the former Hodge Boiler Works Co. site on the East Boston waterfront is back in play after previous projects approved by what was then the Boston Redevelopment Agency in 2004 and 2012 never materialized.

The Davis Cos. is proposing 119 apartments and about 7,200 square feet of shared work space open to the public on the 2.5-acre parcel on Boston Harbor next to LoPresti Park, according to a filing with the Boston Planning & Development Agency this week. The project would fill a key missing link on the East Boston waterfront.

Read the full article: Boston Herald